CASE STUDIES

 

ELECTROWINNING TANKHOUSE VENTILATION

 

The system was designed, installed and commissioned by DESOM Environmental Systems Ltd. The project objectives included prevention of cross contamination of ions back into the cells, compliance with environmental regulations, and compliance with health and safety regulations. The design was optimized with the use of Physical Hydraulic modeling technology.

Email Us